Brook Preloader
Homepage > Products > Outwear Joint Filler and Exterior Primer

Outwear Joint Filler and Exterior Primer

Application

  • Surface Preparation;

Dust and anti-adhering agents must be removed from the surface before application. The smoothness and mechanical strength of the application surface should be checked.

  • Application;

The mortar is a joint filling material with a suitable consistency of 25 kg to 5-7 liters of water. Mix with low speed mixer into clean water for 3-5 minutes until no lumps remain. The mortar which is left to rest for 5 minutes is remixed for a short time and becomes ready for use.

  • Application Conditions;

The ambient temperature should be between + 5 ° C and + 30 ° C.

  • In Joint Filling Process;

Pre-fill the gaps more than 3 mm before application. Self-adhesive alkali-resistant joint tape is applied on the width of steel trowel.

  • Surface Plastering; After the mortar is applied with a 10 mm comb trowel on the previously closed surface, the alkali resistant plaster net is applied to the surface and the surface is closed with a plaster trowel applied to the surface and the surface is closed. Plaster mesh should be applied by overlapping 10 cm on the other mesh in additional sweat.

Performance

It is used as an undercoat plaster on the outer surface with outwear joint tape and on the outer surface with the outer mesh. Polymer modified, fiber reinforced, one component cement based plaster material.

·It can be used both indoors and outdoors.

·It has high adhesion strength on the applied surface.

·The surface to be applied must be clean and smooth.

·Class A1 is fireproof. (According to TS EN 13963)